Process Configuration Tools
1) Fully according to company actual production organization model, Achieve all workshop and warehouse operation management units within the system.
2) According to actual business, Configure Products material flow processes between all workshop and warehouse operation management units at all levels, Achieve completely independent operation documents.
3) Achieve workshop internal section level operation isolation, each section Can have independent Manufacturing Order document.
4) Achieve workshop internal section level operation with different steps manufacturing routes, each section Can execute independent single-step production, two-step (Material Picking first then production) production, three-step (Material Picking then production then Stock In) production.
5) Within workshop or section, correct Dependencies relationship when producing parts at different levels.
6) Parts at different BOM levels Can automatically execute correct receiving/dispatching routes. Like a common part existing at part, component, and final assembly three levels with different Quantity, after Procurement Stock In from raw material warehouse, automatically generate Material Picking issue slips in three directions according to each workshop required Quantity.
7)
Same Procurement warehouse Procurement operations Can execute different steps Procurement routes, e.g. single-step Procurement for small inspection-exempt materials (supplier delivers directly Stock In), two-step Stock In (unload then Stock In), three-step Procurement (receive, Quality Check, Stock In)




